Case Studies

Client Debenhams

Newcastle

  • Tiled with 600x600 White, Cream and Black Tiles
  • 10,000m2
  • Curved pathways completed by Water jet cutting
  • Completed January 2010

 

Manchester

  • Tiled with 600x600 White, Cream and Black Tiles
  • 2,500m²
  • Completed July 2010

 

Debenhams Desire 

  • Store completed all over the UK
  • Walton-on Thames, LLanelli, Dunfermline, Livingstone, Witney

Client BHS (British Home Stores)

We have recently completed contracts for BHS in Basildon and Basingstoke

Project Details:

  • Tiled with 900x900 Floor Tiles
  • 3,000m2 in each store
  • All tiling was carried out while the shop was still operating.
  • Completed November 2010

Client Audi

Various Audi Showrooms (UK)

  • Tiled with 600x600, 300x600 and 200x200 Tiles
  • Average 3000m2 per showroom
  • On going Projects  

 


Client John Lewis

Eldon Square Newcastle Upon Tyne

  • Tiled with 600x600 Tiles
  • 3,850m²
  • Completed August 2010
 

Bon Accord Centre, Aberdeen

  • 2,500m²
  • Completed September 2010

Client Peacocks

  • Tiled with 450x450
  • Average store is around 750m2
  • Stores are completed all over the UK
  • Stores complete in the last year are:
    • Aberdeen
    • Arbroath
    • Belfast
    • Blackburn
    • Bury
    • Coleraine
    • Glasgow
    • Kirkcaldy
    • Lowestoft
    • Wakefield

Client Jurys Inn

 Tiled with various sizes of Tiles (inc marble) Specified by Interior Designer/Architect

Sheffield

  • 750m²
  • Completed January 2008

 

Watford

  • 4,000m²
  • Completed March 2008

 

Croke Park, Dublin

  • 7,000m²
  • Completed May 2005

Client Topman / Topshop

Tiled with 600x600 Tiles

Oxford Circus London

 

Southampton

  • 9,000m²
  • Completed February 2010
 
  • 300m²
  • Completed August 2009
     

Wolverhampton

 

Nottingham

  • 250m²
  • Completed August 2010
 
  • 400m²
  • Completed July 2010
     

Manchester

   
  • 2,000m²
  • Completed August 2010
   

 

 


Client BMW and Mini Showrooms

Various BMW and Mini Showrooms (UK)

  • Tiled with 590x590, 294x590 and 198x96 Tiles
  • Average 3000m2 per Showroom
  • On going projects 

 


Client World Duty Free

Tiled with 600x600 - Black and White

Birmingham Airport

  • 1,300m2
  • Completed March 2011 – Also completed within this job Channel, Cairns and Dior fit-outs.

 

Bristol Airport

  • 1,100m2
  • Completed February 2010

 

Both jobs had complex flooring layouts where Waterjet cutting process was used to create circle and curved walkways around the shop.


Client Swimming Pools

Tiled with 600x600, 200x200, 225x122,

Finglas Dublin

  • 2,500m²
  • Completed October 2003

 

Tuam Galway

  • 3,000m²
  • Completed July 2004

 

DW Fitness Club

  • Belfast and Newtownabbey
  • Full leisure centres with swimming pools 

 

Lough Erne Hotel and Golf Resort

  • Completed in 2007
  • This resort has a 120 room hotel, 25 luxurious lodges, Spa and Swimming pool. 
  • It also has over 50 number homes dotted around the Nick Faldo Golf course.
     

Client Holiday Inn

Belfast

Tiles as Specified by Interior Designer/Architect

  • 170nr rooms completed in under 2 months
  • 600 x 600 Floor Tiling to the new Hotel Lobby
     

 


Client Other Projects

Other project completed by Tyrone tiling Contracts include: 

Hard Rock Café

 

Beacon Private Hospital

  • Park Lane London
  • 150m²
  • Completed June 2010
 
  • Various tiles including Marble
  • 1,000m²
  • Completed September 2006
     
     

Eden Centre High Wycombe

 

Marks & Spencer - Sprucefield

  • Tiled with 600x300 Tiles
  • 3,500m²
  • Completed February 2008
 
  • Tiled with 600x300 Tiles
  • 1,300m²
  • Completed August 2007
     
     

McDonalds

Various stores throughout UK and Ireland.

 

Asda

Various stores throughout UK and Ireland.

     

KFC

Various stores throughout UK and Ireland.

 

Tesco

Various stores throughout UK and Ireland.

     

Crowne Plaza Hotels

 

Radison SAS Hotels

Tiled with Various Tiles inc Marble

Dublin
  • 13,000m²
  • Completed September 2008
 

Tiled with Various tiles and marble

Letterkenny
  • 7,000m²
  • Completed 2003
Dundalk
  • 1,500m²
  • Completed August 2007
 
Farnham Estate Cavan
  • 4,000m²
  • Completed 2006
Dublin Airport
  • 500m²
  • Completed July 2007